I have a new 5.5KW solar system on my roof and I just got PTO (permission to operate) last Friday. I figured this was a must have accessory to go with my I-meiv.
Installation went pretty smoothly, even with a two week delay from PG&E due to the wildfires in Paradise which was understandable. In fact, PG&E was very easy to work with. The only thing I had to do was relocate a rain downspout that was right over the new inverter mounted on the wall.
Now I have to look into which service plans are available to me.
Installation went pretty smoothly, even with a two week delay from PG&E due to the wildfires in Paradise which was understandable. In fact, PG&E was very easy to work with. The only thing I had to do was relocate a rain downspout that was right over the new inverter mounted on the wall.
Now I have to look into which service plans are available to me.